Track Engineering and Permanent Way
(heavy and light rail systems)
Routine basic track inspections
Track engineer’s inspections
Track maintenance
Track renewals
Provision of 5 year plan future maintenance and renewal
Track drainage inspection, maintenance and renewal
Direct fastened track
Track on longitudinal timbers (waybeams)
Rail stressing
Rail surveying
Track monitoring after disturbance (eg. Piling, UTX installation)
Supply of track materials
Derailment Response
Rerailing of derailed vehicles
Guaranteed 4 hour on site response time to majority of UK
Track repairs completed during same visit where possible
Re-opening of track by competent track handback engineer
Detailed independent report on derailment cause

Lineside Civils
REB Bases and installation
Signal bases
Location bases and staging
SPT Walkways
Access Points, hardstandings and groundworks
Parking areas, tarmac and line marking
Access steps – timber, concrete and steel systems
Fencing and gates
Handrail systems
Cable Route Works
Cable route condition and capacity surveys
Surface troughing
Elevated troughing
Buried duct routes
Cable tray and trunking
Tro-Tred combined cable and walkway system
Cable route protection, anti-vandal and ballast boarding
Under Track Crossings (UTX)
Under Road Crossings (URX)
Dis boxes
Cable installation
Vegetation removal
Level Crossings
RRAP installation – timber, Strail and Holdfast
Uplift and reinstallation of level crossings for track maintenance work
Installation of steel and concrete edge beams.
LC maintenance, replacement of damaged panels and rubbers
Maintain fencing, gates and signage
Pedestrian and occupational crossings
